Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Cube-Storage AS/RS Goods-to-Person Picking Cell
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
19 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
73 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Carousel Port Put-to-Light
3,240 < 4,200/day
Limit: downtime
Carousel Port Put-to-Light: capacity 3,240/day vs demand 4,200/day. Main limit: downtime. Raw C/T 21 s, effective C/T 24 s.
Quality (RTY)
92.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€277,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
175.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Consumer Tech Wholesa…
Small-Item High-Density…
Daily · LT 3d
PRODUCTION CONTROL / ERP
AS/RS + WMS
Fixed Waves 10h / 14h / 17h
CUSTOMER
D2C Online Customers
4,200 orders/d
Takt: 19 s
EDI / 3 Waves / day
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
5,040
1.20 d
Drag to reorder step 1
INBOUND
1. Bin Decanting & …
×3
Push Flow
C/T
12 s
C/O
15 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
2100 / 1d
OEE
91.8%
i
Insert a step here
+
E
6,720
1.60 d
Drag to reorder step 2
RESERVE
2. Robot Grid Cube …
×4
Kanban Pull
C/T
15 s
C/O
10 min
Availability
94%
Quality FPY
99.1%
Batch / EPEI
1680 / 1d
OEE
91.4%
i
KANBAN
Insert a step here
+
I
4,620
1.10 d
FLOW
ABC Slott…
Drag to reorder step 3
PICK FLOOR
3. Carousel Port Pu…
×6
BOTTLENECK
C/T
21 s
C/O
18 min
Availability
89%
Quality FPY
96.9%
Batch / EPEI
1260 / 1d
OEE
82.4%
i
Insert a step here
+
I
2,940
0.70 d
Drag to reorder step 4
PACK BENCH
4. Right-Size Autom…
×4
FIFO Lane
C/T
16 s
C/O
8 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
840 / 1d
OEE
88.8%
i
FIFO
Insert a step here
+
I
1,680
0.40 d
Drag to reorder step 5
OUTBOUND
5. Sort Chute Parce…
×2
Continuous Flow
C/T
10 s
C/O
12 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
1680 / 1d
OEE
94.4%
i
Insert a step at the end
+
I
2,100
0.50 d
Finished Goods
OUT
1.20 d
VA 12 s
1.60 d
VA 15 s
1.10 d
VA 21 s
0.70 d
VA 16 s
0.40 d
VA 10 s
0.50 d
Total Lead Time
5.50 d
VA Time
73 s
PCE
0.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step