Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Contract Co-Packing & Promotional Endcap 3PL
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
113 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.51 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.14%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Mixed SKU Repack Cell
362 < 480/day
Limit: downtime
Mixed SKU Repack Cell: capacity 362/day vs demand 480/day. Main limit: downtime. Raw C/T 2.0 min, effective C/T 2.3 min.
Quality (RTY)
92.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€153,120
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
20.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Multi-Brand FMCG Plan…
Mixed SKUs & Corrugate …
Daily · LT 3d
PRODUCTION CONTROL / ERP
3PL WMS
Fixed Waves 10h / 14h / 17h
CUSTOMER
National Hypermarkets
480 units/d
Takt: 113 s
EDI / 3 Waves / day
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
576
1.20 d
Drag to reorder step 1
INBOUND
1. Raw Promo Stock …
×3
Push Flow
C/T
68 s
C/O
15 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
240 / 1d
OEE
90.7%
i
Insert a step here
+
E
768
1.60 d
Drag to reorder step 2
RESERVE
2. Manual Display T…
×4
Kanban Pull
C/T
88 s
C/O
10 min
Availability
94%
Quality FPY
99.1%
Batch / EPEI
192 / 1d
OEE
90.6%
i
KANBAN
Insert a step here
+
I
528
1.10 d
FLOW
ABC Slott…
Drag to reorder step 3
PICK FLOOR
3. Mixed SKU Repack…
×6
BOTTLENECK
C/T
2.0 min
C/O
18 min
Availability
89%
Quality FPY
96.9%
Batch / EPEI
144 / 1d
OEE
80.5%
i
Insert a step here
+
I
336
0.70 d
Drag to reorder step 4
PACK BENCH
4. Price Sticker & …
×4
FIFO Lane
C/T
95 s
C/O
8 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
96 / 1d
OEE
87.4%
i
FIFO
Insert a step here
+
I
192
0.40 d
Drag to reorder step 5
OUTBOUND
5. Retail Hub Slot …
×2
Continuous Flow
C/T
59 s
C/O
12 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
192 / 1d
OEE
93.3%
i
Insert a step at the end
+
I
240
0.50 d
Finished Goods
OUT
1.20 d
VA 68 s
1.60 d
VA 88 s
1.10 d
VA 2.0 min
0.70 d
VA 95 s
0.40 d
VA 59 s
0.50 d
Total Lead Time
5.51 d
VA Time
7.2 min
PCE
0.14%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step