Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Personalized Subscription Beauty Box Kitting
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
17 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
64 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
7-Station Pick-to-Conveyor
2,401 < 3,200/day
Limit: downtime
7-Station Pick-to-Conveyor: capacity 2,401/day vs demand 3,200/day. Main limit: downtime. Raw C/T 18 s, effective C/T 21 s.
Quality (RTY)
92.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€193,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
133.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
20 Cosmetic Partner B…
Miniature Tubes & Sleev…
Daily · LT 3d
PRODUCTION CONTROL / ERP
Fulfilment WMS
Fixed Waves 10h / 14h / 17h
CUSTOMER
Monthly Subscribers
3,200 packs/d
Takt: 17 s
EDI / 3 Waves / day
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
3,840
1.20 d
Drag to reorder step 1
INBOUND
1. Bulk Skid Receiv…
×3
Push Flow
C/T
10 s
C/O
15 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
1600 / 1d
OEE
90.7%
i
Insert a step here
+
E
5,120
1.60 d
Drag to reorder step 2
RESERVE
2. Line Replenish S…
×4
Kanban Pull
C/T
13 s
C/O
10 min
Availability
94%
Quality FPY
99.1%
Batch / EPEI
1280 / 1d
OEE
90.6%
i
KANBAN
Insert a step here
+
I
3,520
1.10 d
FLOW
ABC Slott…
Drag to reorder step 3
PICK FLOOR
3. 7-Station Pick-t…
×6
BOTTLENECK
C/T
18 s
C/O
18 min
Availability
89%
Quality FPY
96.9%
Batch / EPEI
960 / 1d
OEE
80.5%
i
Insert a step here
+
I
2,240
0.70 d
Drag to reorder step 4
PACK BENCH
4. Custom Card Inse…
×4
FIFO Lane
C/T
14 s
C/O
8 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
640 / 1d
OEE
87.4%
i
FIFO
Insert a step here
+
I
1,280
0.40 d
Drag to reorder step 5
OUTBOUND
5. Weight Audit & P…
×2
Continuous Flow
C/T
8.8 s
C/O
12 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
1280 / 1d
OEE
93.3%
i
Insert a step at the end
+
I
1,600
0.50 d
Finished Goods
OUT
1.20 d
VA 10 s
1.60 d
VA 13 s
1.10 d
VA 18 s
0.70 d
VA 14 s
0.40 d
VA 8.8 s
0.50 d
Total Lead Time
5.50 d
VA Time
64 s
PCE
0.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step