Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Urban HORECA Cellar Drop & Empty Keg Pickup
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
40 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.81 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.15%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Cellar Chiller Rotation FEFO
420 < 680/day
Limit: changeovers
Cellar Chiller Rotation FEFO: capacity 420/day vs demand 680/day. Main limit: changeovers. Raw C/T 43 s, effective C/T 54 s.
Quality (RTY)
87.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€62,016
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
296.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Regional Beverage Dep…
Full Kegs & Bottled Cra…
Daily · LT 1d
PRODUCTION CONTROL / ERP
BevRoute TMS
Manual Route Sequence Queue
CUSTOMER
Bars, Cafes & Restaur…
680 units/d
Takt: 40 s
EDI / Daily Routes
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
408
0.60 d
Drag to reorder step 1
DISPATCH DESK
1. Overnight Route …
×2
Push Flow
C/T
25 s
C/O
10 min
Availability
96%
Quality FPY
98.4%
Batch / EPEI
204 / 1d
OEE
87.5%
i
Insert a step here
+
I
544
0.80 d
Drag to reorder step 2
CROSS-DOCK
2. Tail-Lift & Elec…
×4
FIFO Lane
C/T
33 s
C/O
12 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
170 / 1d
OEE
80.4%
i
FIFO
Insert a step here
+
I
680
1.00 d
GREEN
Dynamic T…
Drag to reorder step 3
ROAD ROUTE
3. Cellar Chiller R…
×5
BOTTLENECK
C/T
43 s
C/O
15 min
Availability
85%
Quality FPY
94.5%
Batch / EPEI
136 / 1d
OEE
66.9%
i
Insert a step here
+
I
408
0.60 d
Drag to reorder step 4
BACKHAUL
4. Empty Kegs & Gla…
×2
FIFO Lane
C/T
29 s
C/O
8 min
Availability
94%
Quality FPY
97.4%
Batch / EPEI
136 / 1d
OEE
83.4%
i
FIFO
Insert a step here
+
I
272
0.40 d
Drag to reorder step 5
FLEET BILLING
5. Deposit Credit A…
×1
Continuous Flow
C/T
22 s
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
170 / 1d
OEE
92.8%
i
Insert a step at the end
+
I
272
0.40 d
Finished Goods
OUT
0.60 d
VA 25 s
0.80 d
VA 33 s
1.00 d
VA 43 s
0.60 d
VA 29 s
0.40 d
VA 22 s
0.40 d
Total Lead Time
3.81 d
VA Time
2.5 min
PCE
0.15%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step