Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Flammable Perfume & Aerosol DG E-Commerce Cell
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
34 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Grounded Anti-Static Pick
1,204 < 1,600/day
Limit: downtime
Grounded Anti-Static Pick: capacity 1,204/day vs demand 1,600/day. Main limit: downtime. Raw C/T 36 s, effective C/T 42 s.
Quality (RTY)
92.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€255,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
66.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Luxury Fragrance Hous…
Alcohol Sprays & Pressu…
Daily · LT 3d
PRODUCTION CONTROL / ERP
Warehouse management system
Fixed Waves 10h / 14h / 17h
CUSTOMER
Online Perfume Buyers
1,600 orders/d
Takt: 34 s
EDI / 3 Waves / day
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
1,920
1.20 d
Drag to reorder step 1
INBOUND
1. ATEX Ventilated …
×3
Push Flow
C/T
20 s
C/O
15 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
800 / 1d
OEE
90.7%
i
Insert a step here
+
E
2,560
1.60 d
Drag to reorder step 2
RESERVE
2. Spill-Tray Sprin…
×4
Kanban Pull
C/T
26 s
C/O
10 min
Availability
94%
Quality FPY
99.1%
Batch / EPEI
640 / 1d
OEE
90.6%
i
KANBAN
Insert a step here
+
I
1,760
1.10 d
FLOW
ABC Slott…
Drag to reorder step 3
PICK FLOOR
3. Grounded Anti-St…
×6
BOTTLENECK
C/T
36 s
C/O
18 min
Availability
89%
Quality FPY
96.9%
Batch / EPEI
480 / 1d
OEE
80.5%
i
Insert a step here
+
I
1,120
0.70 d
Drag to reorder step 4
PACK BENCH
4. UN LQ Diamond Bo…
×4
FIFO Lane
C/T
28 s
C/O
8 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
320 / 1d
OEE
87.4%
i
FIFO
Insert a step here
+
I
640
0.40 d
Drag to reorder step 5
OUTBOUND
5. Dedicated Ground…
×2
Continuous Flow
C/T
18 s
C/O
12 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
640 / 1d
OEE
93.3%
i
Insert a step at the end
+
I
800
0.50 d
Finished Goods
OUT
1.20 d
VA 20 s
1.60 d
VA 26 s
1.10 d
VA 36 s
0.70 d
VA 28 s
0.40 d
VA 18 s
0.50 d
Total Lead Time
5.50 d
VA Time
2.1 min
PCE
0.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step