Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Intercity Night Swap-Body Linehaul Relay
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
10.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.84 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
38.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.10%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
5-Min Trailer/Body Exchange
61 < 90/day
Limit: downtime
5-Min Trailer/Body Exchange: capacity 61/day vs demand 90/day. Main limit: downtime. Raw C/T 10.8 min, effective C/T 13.4 min.
Quality (RTY)
87.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€82,080
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
39.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
North Parcel Sorting …
Pre-Loaded 7.45m Swap B…
Daily · LT 1d
PRODUCTION CONTROL / ERP
Linehaul TMS
Manual Route Sequence Queue
CUSTOMER
South Regional Delive…
90 TEU/d
Takt: 10.0 min
EDI / Daily Routes
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
54
0.60 d
Drag to reorder step 1
DISPATCH DESK
1. Yard Tractor Swa…
×2
Push Flow
C/T
6.4 min
C/O
10 min
Availability
96%
Quality FPY
98.4%
Batch / EPEI
27 / 1d
OEE
91.0%
i
Insert a step here
+
I
72
0.80 d
Drag to reorder step 2
CROSS-DOCK
2. Midpoint Highway…
×4
FIFO Lane
C/T
8.2 min
C/O
12 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
23 / 1d
OEE
85.3%
i
FIFO
Insert a step here
+
I
90
1.00 d
GREEN
Dynamic T…
Drag to reorder step 3
ROAD ROUTE
3. 5-Min Trailer/Bo…
×5
BOTTLENECK
C/T
10.8 min
C/O
15 min
Availability
85%
Quality FPY
94.5%
Batch / EPEI
18 / 1d
OEE
73.6%
i
Insert a step here
+
I
54
0.60 d
Drag to reorder step 4
BACKHAUL
4. GPS Geofence Arr…
×2
FIFO Lane
C/T
7.2 min
C/O
8 min
Availability
94%
Quality FPY
97.4%
Batch / EPEI
18 / 1d
OEE
87.5%
i
FIFO
Insert a step here
+
I
36
0.40 d
Drag to reorder step 5
FLEET BILLING
5. Pre-Dawn Bay Unl…
×1
Continuous Flow
C/T
5.6 min
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
23 / 1d
OEE
95.0%
i
Insert a step at the end
+
I
36
0.40 d
Finished Goods
OUT
0.60 d
VA 6.4 min
0.80 d
VA 8.2 min
1.00 d
VA 10.8 min
0.60 d
VA 7.2 min
0.40 d
VA 5.6 min
0.40 d
Total Lead Time
3.84 d
VA Time
38.2 min
PCE
1.10%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step