Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
8.2 min
Lead Time (LT)
3.83 d
Value-Added
31.3 min
Efficiency (PCE)
0.91%
BottleneckPlant Weighbridge Gross Weight
75 < 110/day
Limit: downtime
Quality (RTY)
87.8%
WIP Capital
€45,980
Carbon CO₂
48.0 t CO₂e/year