Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
White-Glove Furniture & Gym In-Home Install
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
3.83 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
12.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.71%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Carry-In, Assembly & Leveling
87 < 140/day
Limit: changeovers
Carry-In, Assembly & Leveling: capacity 87/day vs demand 140/day. Main limit: changeovers. Raw C/T 3.5 min, effective C/T 4.3 min.
Quality (RTY)
87.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€50,540
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
61.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Furniture Regional Hu…
Flat-Pack & Upholstered…
Daily · LT 1d
PRODUCTION CONTROL / ERP
WhiteGlove TMS
Manual Route Sequence Queue
CUSTOMER
Home & Office Buyers
140 orders/d
Takt: 3.2 min
EDI / Daily Routes
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
84
0.60 d
Drag to reorder step 1
DISPATCH DESK
1. Route Sequence P…
×2
Push Flow
C/T
2.1 min
C/O
10 min
Availability
96%
Quality FPY
98.4%
Batch / EPEI
42 / 1d
OEE
87.5%
i
Insert a step here
+
I
112
0.80 d
Drag to reorder step 2
CROSS-DOCK
2. Pre-Arrival 30-M…
×4
FIFO Lane
C/T
2.6 min
C/O
12 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
35 / 1d
OEE
80.4%
i
FIFO
Insert a step here
+
I
140
1.00 d
GREEN
Dynamic T…
Drag to reorder step 3
ROAD ROUTE
3. Carry-In, Assemb…
×5
BOTTLENECK
C/T
3.5 min
C/O
15 min
Availability
85%
Quality FPY
94.5%
Batch / EPEI
28 / 1d
OEE
66.9%
i
Insert a step here
+
I
84
0.60 d
Drag to reorder step 4
BACKHAUL
4. Packaging Foam B…
×2
FIFO Lane
C/T
2.3 min
C/O
8 min
Availability
94%
Quality FPY
97.4%
Batch / EPEI
28 / 1d
OEE
83.4%
i
FIFO
Insert a step here
+
I
56
0.40 d
Drag to reorder step 5
FLEET BILLING
5. Photo Sign-Off C…
×1
Continuous Flow
C/T
108 s
C/O
5 min
Availability
98%
Quality FPY
99.1%
Batch / EPEI
35 / 1d
OEE
92.8%
i
Insert a step at the end
+
I
56
0.40 d
Finished Goods
OUT
0.60 d
VA 2.1 min
0.80 d
VA 2.6 min
1.00 d
VA 3.5 min
0.60 d
VA 2.3 min
0.40 d
VA 108 s
0.40 d
Total Lead Time
3.83 d
VA Time
12.3 min
PCE
0.71%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step