Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
3.2 min
Lead Time (LT)
3.83 d
Value-Added
12.3 min
Efficiency (PCE)
0.71%
BottleneckCarry-In, Assembly & Leveling
87 < 140/day
Limit: changeovers
Quality (RTY)
87.8%
WIP Capital
€50,540
Carbon CO₂
61.1 t CO₂e/year