Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Two-Man Bulky Home Appliance Cross-Dock
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
71 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.51 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.18%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Zone Floor Bay Staging
266 < 380/day
Limit: changeovers
Zone Floor Bay Staging: capacity 266/day vs demand 380/day. Main limit: changeovers. Raw C/T 76 s, effective C/T 88 s.
Quality (RTY)
92.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€407,550
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
15.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Appliance Import Hubs
Bulky Branded White Goo…
Daily · LT 3d
PRODUCTION CONTROL / ERP
WMS + Fleet Routing
Fixed Waves 10h / 14h / 17h
CUSTOMER
Retail & Home Install…
380 units/d
Takt: 71 s
EDI / 3 Waves / day
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
456
1.20 d
Drag to reorder step 1
INBOUND
1. Clamp-Truck Floo…
×3
Push Flow
C/T
43 s
C/O
15 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
190 / 1d
OEE
87.6%
i
Insert a step here
+
E
608
1.60 d
Drag to reorder step 2
RESERVE
2. Visual Box Damag…
×4
Kanban Pull
C/T
55 s
C/O
10 min
Availability
94%
Quality FPY
99.1%
Batch / EPEI
152 / 1d
OEE
88.0%
i
KANBAN
Insert a step here
+
I
418
1.10 d
FLOW
ABC Slott…
Drag to reorder step 3
PICK FLOOR
3. Zone Floor Bay S…
×6
BOTTLENECK
C/T
76 s
C/O
18 min
Availability
89%
Quality FPY
96.9%
Batch / EPEI
114 / 1d
OEE
74.7%
i
Insert a step here
+
I
266
0.70 d
Drag to reorder step 4
PACK BENCH
4. Zip-Code Two-Man…
×4
FIFO Lane
C/T
60 s
C/O
8 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
76 / 1d
OEE
83.4%
i
FIFO
Insert a step here
+
I
152
0.40 d
Drag to reorder step 5
OUTBOUND
5. Scheduled Window…
×2
Continuous Flow
C/T
37 s
C/O
12 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
152 / 1d
OEE
90.1%
i
Insert a step at the end
+
I
190
0.50 d
Finished Goods
OUT
1.20 d
VA 43 s
1.60 d
VA 55 s
1.10 d
VA 76 s
0.70 d
VA 60 s
0.40 d
VA 37 s
0.50 d
Total Lead Time
5.51 d
VA Time
4.5 min
PCE
0.18%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step