Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Nickel-Alloy 718 High-Temp 12-Point Aero Bolt
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
15 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.7 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
59 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Radiused Fillet Cold-Roll Thread
2,607 < 3,600/day
Limit: downtime
Radiused Fillet Cold-Roll Thread: capacity 2,607/day vs demand 3,600/day. Main limit: downtime. Raw C/T 16 s, effective C/T 20 s.
Quality (RTY)
90.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€847,440
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
355.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Titanium & nickel-all…
Nickel-Alloy 718 Cold-D…
Weekly Rod Coil · LT 6d
PRODUCTION CONTROL / ERP
Aerospace ERP
Campaign Heat-Treat Push
CUSTOMER
Airframer Engine Asse…
3,600 parts/d
Takt: 15 s
EDI / Daily Pallet
MRP / Weekly Rod Coil
★ PACEMAKER
IN
Insert a step at the start
+
I
7,920
2.20 d
Drag to reorder step 1
HEADER LINE
1. Warm-Forge 12-Po…
×2
Push Flow
C/T
11 s
C/O
65 min
Availability
90%
Quality FPY
98.8%
Batch / EPEI
7200 / 3d
OEE
85.7%
i
Insert a step here
+
I
6,480
1.80 d
Drag to reorder step 2
TOOTH/THREAD
2. Centerless Shank…
×2
Push Flow
C/T
13 s
C/O
45 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
5400 / 2d
OEE
85.9%
i
Insert a step here
+
I
8,640
2.40 d
FLOW
Pull Cell…
Drag to reorder step 3
HEAT/GRIND
3. Radiused Fillet …
×2
BOTTLENECK
C/T
16 s
C/O
50 min
Availability
84%
Quality FPY
96.1%
Batch / EPEI
5400 / 3d
OEE
77.7%
i
Insert a step here
+
I
5,400
1.50 d
Drag to reorder step 4
PLATING BAY
4. Solution Aging &…
×2
Push Flow
C/T
11 s
C/O
20 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
3600 / 2d
OEE
89.5%
i
Insert a step here
+
I
2,880
0.80 d
Drag to reorder step 5
AUTO PACK
5. 100% Optical Thr…
×1
FIFO Lane
C/T
8.4 s
C/O
12 min
Availability
97%
Quality FPY
99.6%
Batch / EPEI
1800 / 1d
OEE
94.0%
i
Insert a step at the end
+
I
7,200
2.00 d
Finished Goods
OUT
2.20 d
VA 11 s
1.80 d
VA 13 s
2.40 d
VA 16 s
1.50 d
VA 11 s
0.80 d
VA 8.4 s
2.00 d
Total Lead Time
10.7 d
VA Time
59 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step