Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
21.4 min
Lead Time (LT)
8.28 d
Value-Added
1.4 h
Efficiency (PCE)
1.14%
BottleneckSafety Lidar & ROS2 PC Mount
30 < 42/day
Limit: downtime
Quality (RTY)
88.1%
WIP Capital
€1,788,800
Carbon CO₂
25.4 t CO₂e/year