Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Microchannel V-Bank Adiabatic Air Condenser
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
25.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.22 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.20%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
V-Frame Aluminum Assembly
25 < 36/day
Limit: downtime
V-Frame Aluminum Assembly: capacity 25/day vs demand 36/day. Main limit: downtime. Raw C/T 27.0 min, effective C/T 33.7 min.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,344,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
11.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Aluminum Micro-Extrus…
All-Aluminum CAB Coils
2x / week · LT 5d
PRODUCTION CONTROL / ERP
Manufacturing ERP
Batch Bake Queue Push
CUSTOMER
Cooling Integrators
36 units/d
Takt: 25.0 min
EDI / Daily Truck
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
61
1.69 d
Drag to reorder step 1
COIL/STAMP
1. Multi-Port Tube …
×2
Push Flow
C/T
17.0 min
C/O
35 min
Availability
93%
Quality FPY
98.7%
Batch / EPEI
54 / 2d
OEE
89.4%
i
Insert a step here
+
I
65
1.81 d
Drag to reorder step 2
WINDING HALL
2. CAB Nitrogen Bra…
×3
Push Flow
C/T
21.5 min
C/O
30 min
Availability
90%
Quality FPY
96.9%
Batch / EPEI
29 / 2d
OEE
83.6%
i
Insert a step here
+
I
79
2.19 d
SMED
Trickle U…
Drag to reorder step 3
THERMAL CELL
3. V-Frame Aluminum…
×3
BOTTLENECK
C/T
27.0 min
C/O
45 min
Availability
84%
Quality FPY
95.5%
Batch / EPEI
36 / 2d
OEE
76.2%
i
Insert a step here
+
I
40
1.11 d
Drag to reorder step 4
ASSEMBLY BAY
4. EC Axial Fan & M…
×3
FIFO Lane
C/T
19.5 min
C/O
15 min
Availability
94%
Quality FPY
98.3%
Batch / EPEI
14 / 1d
OEE
88.4%
i
FIFO
Insert a step here
+
I
29
0.81 d
Drag to reorder step 5
EOL QC
5. 30-Bar Nitrogen …
×2
Continuous Flow
C/T
15.0 min
C/O
8 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
7 / 1d
OEE
90.8%
i
Insert a step at the end
+
I
54
1.50 d
Finished Goods
OUT
1.69 d
VA 17.0 min
1.81 d
VA 21.5 min
2.19 d
VA 27.0 min
1.11 d
VA 19.5 min
0.81 d
VA 15.0 min
1.50 d
Total Lead Time
9.22 d
VA Time
1.7 h
PCE
1.20%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step