Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Multilevel Warehouse AS/RS Rail Shuttle
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
16.4 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.29 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.87%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Supercapacitor 20s Charge Fit
39 < 55/day
Limit: downtime
Supercapacitor 20s Charge Fit: capacity 39/day vs demand 55/day. Main limit: downtime. Raw C/T 17.5 min, effective C/T 21.7 min.
Quality (RTY)
88.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,401,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
33.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Supercapacitors & Al …
Laser Telescopic Fork D…
Weekly · LT 9d
PRODUCTION CONTROL / ERP
Logistics ERP
Order Build Slot
CUSTOMER
Cold & E-Commerce AS/…
55 units/d
Takt: 16.4 min
EDI / Custom Crating
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
99
1.80 d
Drag to reorder step 1
PARTS PREP
1. Al Rail Chassis …
×2
Push Flow
C/T
11.5 min
C/O
25 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
44 / 2d
OEE
89.3%
i
Insert a step here
+
I
83
1.51 d
Drag to reorder step 2
JOINT CELL
2. Twin-Belt Telesc…
×3
Push Flow
C/T
13.8 min
C/O
20 min
Availability
92%
Quality FPY
97.2%
Batch / EPEI
22 / 1d
OEE
84.5%
i
Insert a step here
+
I
110
2.00 d
AUTOMATION
Multi-Bay…
Drag to reorder step 3
LASER BAY
3. Supercapacitor 2…
×3
BOTTLENECK
C/T
17.5 min
C/O
30 min
Availability
85%
Quality FPY
94.8%
Batch / EPEI
28 / 1d
OEE
75.3%
i
Insert a step here
+
I
55
1.00 d
Drag to reorder step 4
CONTROL RACK
4. Track Wheel & La…
×2
FIFO Lane
C/T
12.4 min
C/O
12 min
Availability
95%
Quality FPY
98.0%
Batch / EPEI
14 / 1d
OEE
88.2%
i
FIFO
Insert a step here
+
I
39
0.71 d
Drag to reorder step 5
CERT PACK
5. Dynamic Tote Pul…
×2
Continuous Flow
C/T
9.5 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
8 / 1d
OEE
88.8%
i
Insert a step at the end
+
I
66
1.20 d
Finished Goods
OUT
1.80 d
VA 11.5 min
1.51 d
VA 13.8 min
2.00 d
VA 17.5 min
1.00 d
VA 12.4 min
0.71 d
VA 9.5 min
1.20 d
Total Lead Time
8.29 d
VA Time
1.1 h
PCE
0.87%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step