Current State
Optimize Flow
Takt Time
16.4 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.00 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.80%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Multi-Pass Armored Flux Weld
38 < 55/day
Limit: downtime
Multi-Pass Armored Flux Weld: capacity 38/day vs demand 55/day. Main limit: downtime. Raw C/T 17.7 min, effective C/T 22.1 min.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€451,720
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
35.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Wear-resistant & mang…
12mm Alloy Security Pla…
2x / week · LT 4d
PRODUCTION CONTROL / ERP
Business ERP
Nesting Campaign Push
CUSTOMER
Retail Banking Hardwa…
55 units/d
Takt: 16.4 min
EDI / Daily
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
99
1.80 d
Drag to reorder step 1
CUTTING BAY
1. HD Plasma Armore…
×1
Push Flow
C/T
11.1 min
C/O
20 min
Availability
94%
Quality FPY
99.1%
Batch / EPEI
83 / 2d
OEE
91.8%
i
Insert a step here
+
I
66
1.20 d
Drag to reorder step 2
PREP BENCH
2. Heavy Die Press …
×2
FIFO Lane
C/T
11.8 min
C/O
10 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
28 / 1d
OEE
91.4%
i
FIFO
Insert a step here
+
I
116
2.11 d
SMED
Segmented…
Drag to reorder step 3
FORMING CELL
3. Multi-Pass Armor…
×4
BOTTLENECK
C/T
17.7 min
C/O
55 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
44 / 2d
OEE
73.9%
i
Insert a step here
+
I
94
1.71 d
Drag to reorder step 4
PAINT LINE
4. Composite Cement…
×2
Push Flow
C/T
13.8 min
C/O
35 min
Availability
90%
Quality FPY
96.8%
Batch / EPEI
66 / 2d
OEE
84.3%
i
Insert a step here
+
I
50
0.91 d
Drag to reorder step 5
FINAL CELL
5. Electronic Lock …
×2
FIFO Lane
C/T
10.2 min
C/O
10 min
Availability
96%
Quality FPY
99.0%
Batch / EPEI
17 / 1d
OEE
91.6%
i
Insert a step at the end
+
I
66
1.20 d
Finished Goods
OUT
1.80 d
VA 11.1 min
1.20 d
VA 11.8 min
2.11 d
VA 17.7 min
1.71 d
VA 13.8 min
0.91 d
VA 10.2 min
1.20 d
Total Lead Time
9.00 d
VA Time
1.1 h
PCE
0.80%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen