Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Hot-Forged Lead-Free Brass Radiant Manifold
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
57 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.7 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Shot-Blast & Nickel Flash
688 < 950/day
Limit: downtime
Shot-Blast & Nickel Flash: capacity 688/day vs demand 950/day. Main limit: downtime. Raw C/T 61 s, effective C/T 76 s.
Quality (RTY)
90.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€487,920
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
93.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Brass rod supplier
Lead-Free Brass Billet
Weekly Rod Coil · LT 6d
PRODUCTION CONTROL / ERP
Business ERP
Campaign Heat-Treat Push
CUSTOMER
European Hydronic Plu…
950 units/d
Takt: 57 s
EDI / Daily Pallet
MRP / Weekly Rod Coil
★ PACEMAKER
IN
Insert a step at the start
+
I
2,090
2.20 d
Drag to reorder step 1
HEADER LINE
1. 1000T Closed-Die…
×2
Push Flow
C/T
41 s
C/O
65 min
Availability
90%
Quality FPY
98.8%
Batch / EPEI
1900 / 3d
OEE
85.7%
i
Insert a step here
+
I
1,710
1.80 d
Drag to reorder step 2
TOOTH/THREAD
2. Transfer Machine…
×2
Push Flow
C/T
48 s
C/O
45 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
1425 / 2d
OEE
85.9%
i
Insert a step here
+
I
2,280
2.40 d
FLOW
Pull Cell…
Drag to reorder step 3
HEAT/GRIND
3. Shot-Blast & Nic…
×2
BOTTLENECK
C/T
61 s
C/O
50 min
Availability
84%
Quality FPY
96.1%
Batch / EPEI
1425 / 3d
OEE
77.7%
i
Insert a step here
+
I
1,425
1.50 d
Drag to reorder step 4
PLATING BAY
4. EPDM Flow-Meter …
×2
Push Flow
C/T
43 s
C/O
20 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
950 / 2d
OEE
89.5%
i
Insert a step here
+
I
760
0.80 d
Drag to reorder step 5
AUTO PACK
5. 10-Bar Bubble De…
×1
FIFO Lane
C/T
32 s
C/O
12 min
Availability
97%
Quality FPY
99.6%
Batch / EPEI
475 / 1d
OEE
94.0%
i
Insert a step at the end
+
I
1,900
2.00 d
Finished Goods
OUT
2.20 d
VA 41 s
1.80 d
VA 48 s
2.40 d
VA 61 s
1.50 d
VA 43 s
0.80 d
VA 32 s
2.00 d
Total Lead Time
10.7 d
VA Time
3.7 min
PCE
0.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step