Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
25-Ton Double-Girder Overhead Bridge Crane
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
56.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.6 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.8 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
4.39%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
End-Truck Wheel Bogie Bore
5 < 8/day
Limit: changeovers
End-Truck Wheel Bogie Bore: capacity 5/day vs demand 8/day. Main limit: changeovers. Raw C/T 1.0 h, effective C/T 1.3 h.
Quality (RTY)
87.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,290,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
22.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
S355J2 Heavy Steel
Welded Box Plates & Hoi…
Weekly · LT 10d
PRODUCTION CONTROL / ERP
Business ERP
Gantry Bottleneck Job-Shop
CUSTOMER
Heavy Steelworks & Fo…
8 units/d
Takt: 56.3 min
EDI / Flatbed Convoy
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
17
2.13 d
Drag to reorder step 1
PLATE PREP
1. NC Camber-Cut We…
×3
Push Flow
C/T
38.3 min
C/O
30 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
12 / 2d
OEE
88.5%
i
Insert a step here
+
I
19
2.38 d
Drag to reorder step 2
WELD HALL
2. Submerged-Arc Bo…
×3
Push Flow
C/T
47.8 min
C/O
45 min
Availability
89%
Quality FPY
96.4%
Batch / EPEI
8 / 2d
OEE
77.2%
i
Insert a step here
+
I
22
2.75 d
SMED
Preset Br…
Drag to reorder step 3
GANTRY MILL
3. End-Truck Wheel …
×2
BOTTLENECK
C/T
1.0 h
C/O
90 min
Availability
83%
Quality FPY
95.8%
Batch / EPEI
8 / 3d
OEE
63.6%
i
Insert a step here
+
I
12
1.50 d
Drag to reorder step 4
BAY ASSEMBLY
4. Wire-Rope Trolle…
×5
FIFO Lane
C/T
46.1 min
C/O
20 min
Availability
92%
Quality FPY
97.4%
Batch / EPEI
4 / 1d
OEE
81.6%
i
FIFO
Insert a step here
+
I
7
0.88 d
Drag to reorder step 5
RUN-OFF BAY
5. 125% Proof Load …
×2
FIFO Lane
C/T
36.0 min
C/O
15 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
2 / 1d
OEE
81.4%
i
Insert a step at the end
+
I
12
1.50 d
Finished Goods
OUT
2.13 d
VA 38.3 min
2.38 d
VA 47.8 min
2.75 d
VA 1.0 h
1.50 d
VA 46.1 min
0.88 d
VA 36.0 min
1.50 d
Total Lead Time
11.6 d
VA Time
3.8 h
PCE
4.39%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen