Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Flush Pharma Cleanroom Airlock Partition
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.92 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
14.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.18%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Pur Hot-Melt Core Press
164 < 240/day
Limit: downtime
Pur Hot-Melt Core Press: capacity 164/day vs demand 240/day. Main limit: downtime. Raw C/T 4.1 min, effective C/T 5.1 min.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€395,160
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
152.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Galvanized Skins & Ho…
Steel Skins & Stone-Woo…
2x / week · LT 4d
PRODUCTION CONTROL / ERP
Business ERP
Nesting Campaign Push
CUSTOMER
GMP Pharma Builders
240 parts/d
Takt: 3.8 min
EDI / Daily
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
432
1.80 d
Drag to reorder step 1
CUTTING BAY
1. Servo Sheet Punc…
×1
Push Flow
C/T
2.6 min
C/O
20 min
Availability
94%
Quality FPY
99.1%
Batch / EPEI
360 / 2d
OEE
91.8%
i
Insert a step here
+
I
288
1.20 d
Drag to reorder step 2
PREP BENCH
2. Double-Sided Bra…
×2
FIFO Lane
C/T
2.7 min
C/O
10 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
120 / 1d
OEE
91.4%
i
FIFO
Insert a step here
+
I
504
2.10 d
SMED
Segmented…
Drag to reorder step 3
FORMING CELL
3. Pur Hot-Melt Cor…
×4
BOTTLENECK
C/T
4.1 min
C/O
55 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
192 / 2d
OEE
73.9%
i
Insert a step here
+
I
408
1.70 d
Drag to reorder step 4
PAINT LINE
4. Antimicrobial Co…
×2
Push Flow
C/T
3.2 min
C/O
35 min
Availability
90%
Quality FPY
96.8%
Batch / EPEI
288 / 2d
OEE
84.3%
i
Insert a step here
+
I
216
0.90 d
Drag to reorder step 5
FINAL CELL
5. Aluminum Cove Pr…
×2
FIFO Lane
C/T
2.3 min
C/O
10 min
Availability
96%
Quality FPY
99.0%
Batch / EPEI
72 / 1d
OEE
91.5%
i
Insert a step at the end
+
I
288
1.20 d
Finished Goods
OUT
1.80 d
VA 2.6 min
1.20 d
VA 2.7 min
2.10 d
VA 4.1 min
1.70 d
VA 3.2 min
0.90 d
VA 2.3 min
1.20 d
Total Lead Time
8.92 d
VA Time
14.8 min
PCE
0.18%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step