Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
5-Axis Turn-Mill Center Machine Bed & Head
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.8 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
5.75%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Hybrid Ceramic Spindle Build
3 < 6/day
Limit: changeovers
Hybrid Ceramic Spindle Build: capacity 3/day vs demand 6/day. Main limit: changeovers. Raw C/T 1.4 h, effective C/T 1.7 h.
Quality (RTY)
87.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,876,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
16.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Cast iron beds
Mineral Cast & Linear R…
Weekly · LT 10d
PRODUCTION CONTROL / ERP
Manufacturing ERP
Gantry Bottleneck Job-Shop
CUSTOMER
Global Tier-1 Machine…
6 units/d
Takt: 1.3 h
EDI / Flatbed Convoy
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
13
2.17 d
Drag to reorder step 1
PLATE PREP
1. Epoxy-Granite Po…
×3
Push Flow
C/T
51.0 min
C/O
30 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
9 / 2d
OEE
88.5%
i
Insert a step here
+
I
14
2.33 d
Drag to reorder step 2
WELD HALL
2. 5-Face Box-Way F…
×3
Push Flow
C/T
1.1 h
C/O
45 min
Availability
89%
Quality FPY
96.4%
Batch / EPEI
6 / 2d
OEE
77.2%
i
Insert a step here
+
I
17
2.83 d
SMED
Preset Br…
Drag to reorder step 3
GANTRY MILL
3. Hybrid Ceramic S…
×2
BOTTLENECK
C/T
1.4 h
C/O
90 min
Availability
83%
Quality FPY
95.8%
Batch / EPEI
6 / 3d
OEE
63.6%
i
Insert a step here
+
I
9
1.50 d
Drag to reorder step 4
BAY ASSEMBLY
4. Turret & CNC Wir…
×5
FIFO Lane
C/T
1.0 h
C/O
20 min
Availability
92%
Quality FPY
97.4%
Batch / EPEI
3 / 1d
OEE
81.6%
i
FIFO
Insert a step here
+
I
5
0.83 d
Drag to reorder step 5
RUN-OFF BAY
5. Circular-Test La…
×2
FIFO Lane
C/T
48.0 min
C/O
15 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
2 / 1d
OEE
84.6%
i
Insert a step at the end
+
I
9
1.50 d
Finished Goods
OUT
2.17 d
VA 51.0 min
2.33 d
VA 1.1 h
2.83 d
VA 1.4 h
1.50 d
VA 1.0 h
0.83 d
VA 48.0 min
1.50 d
Total Lead Time
11.8 d
VA Time
5.1 h
PCE
5.75%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step