Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
12.0 min
Lead Time (LT)
8.27 d
Value-Added
47.4 min
Efficiency (PCE)
0.64%
BottleneckHydraulic Clamp Piston Seal
53 < 75/day
Limit: downtime
Quality (RTY)
88.1%
WIP Capital
€1,016,400
Carbon CO₂
45.3 t CO₂e/year