Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Self-Propelled Combine Harvester Thresher Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.5 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.6 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.52%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Rotary Rotor & Engine Drop
7 < 10/day
Limit: downtime
Rotary Rotor & Engine Drop: capacity 7/day vs demand 10/day. Main limit: downtime. Raw C/T 1.7 h, effective C/T 2.1 h.
Quality (RTY)
87.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€6,048,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
27.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Harvester steel suppl…
Formed Frame & Sieve Sh…
Weekly · LT 10d
PRODUCTION CONTROL / ERP
Manufacturing ERP
Gantry Bottleneck Job-Shop
CUSTOMER
Agricultural Cooperat…
10 units/d
Takt: 1.5 h
EDI / Flatbed Convoy
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
21
2.10 d
Drag to reorder step 1
PLATE PREP
1. Chassis Frame Ro…
×3
Push Flow
C/T
1.0 h
C/O
30 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
15 / 2d
OEE
90.5%
i
Insert a step here
+
I
24
2.40 d
Drag to reorder step 2
WELD HALL
2. E-Coat & Signatu…
×3
Push Flow
C/T
1.3 h
C/O
45 min
Availability
89%
Quality FPY
96.4%
Batch / EPEI
10 / 2d
OEE
81.5%
i
Insert a step here
+
I
28
2.80 d
SMED
Preset Br…
Drag to reorder step 3
GANTRY MILL
3. Rotary Rotor & E…
×2
BOTTLENECK
C/T
1.7 h
C/O
90 min
Availability
83%
Quality FPY
95.8%
Batch / EPEI
10 / 3d
OEE
71.6%
i
Insert a step here
+
I
15
1.50 d
Drag to reorder step 4
BAY ASSEMBLY
4. Cab, Header Lift…
×5
FIFO Lane
C/T
1.2 h
C/O
20 min
Availability
92%
Quality FPY
97.4%
Batch / EPEI
5 / 1d
OEE
85.6%
i
FIFO
Insert a step here
+
I
9
0.90 d
Drag to reorder step 5
RUN-OFF BAY
5. Full-Grain Simul…
×2
FIFO Lane
C/T
57.6 min
C/O
15 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
3 / 1d
OEE
88.7%
i
Insert a step at the end
+
I
15
1.50 d
Finished Goods
OUT
2.10 d
VA 1.0 h
2.40 d
VA 1.3 h
2.80 d
VA 1.7 h
1.50 d
VA 1.2 h
0.90 d
VA 57.6 min
1.50 d
Total Lead Time
11.6 d
VA Time
6.1 h
PCE
3.52%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step