Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.5 h
Lead Time (LT)
11.6 d
Value-Added
6.1 h
Efficiency (PCE)
3.52%
BottleneckRotary Rotor & Engine Drop
7 < 10/day
Limit: downtime
Quality (RTY)
87.6%
WIP Capital
€6,048,000
Carbon CO₂
27.9 t CO₂e/year