Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
8m³ Spiral-Blade Truck Concrete Mixer Drum
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
37.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.4 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.6 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.50%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Track Ring Lathe Turn
16 < 24/day
Limit: downtime
Track Ring Lathe Turn: capacity 16/day vs demand 24/day. Main limit: downtime. Raw C/T 41.3 min, effective C/T 51.9 min.
Quality (RTY)
87.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,022,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
66.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
4mm wear-plate suppli…
Abrasion Steel Cones & …
Weekly · LT 10d
PRODUCTION CONTROL / ERP
Business ERP
Gantry Bottleneck Job-Shop
CUSTOMER
Ready-Mix Concrete Fl…
24 units/d
Takt: 37.5 min
EDI / Flatbed Convoy
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
50
2.08 d
Drag to reorder step 1
PLATE PREP
1. Plate Roll & Sea…
×3
Push Flow
C/T
25.5 min
C/O
30 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
36 / 2d
OEE
90.5%
i
Insert a step here
+
I
58
2.42 d
Drag to reorder step 2
WELD HALL
2. Continuous Inter…
×3
Push Flow
C/T
31.9 min
C/O
45 min
Availability
89%
Quality FPY
96.4%
Batch / EPEI
24 / 2d
OEE
81.5%
i
Insert a step here
+
I
67
2.79 d
SMED
Preset Br…
Drag to reorder step 3
GANTRY MILL
3. Track Ring Lathe…
×2
BOTTLENECK
C/T
41.3 min
C/O
90 min
Availability
83%
Quality FPY
95.8%
Batch / EPEI
24 / 3d
OEE
71.6%
i
Insert a step here
+
I
36
1.50 d
Drag to reorder step 4
BAY ASSEMBLY
4. Zinc Blast & Pol…
×5
FIFO Lane
C/T
30.8 min
C/O
20 min
Availability
92%
Quality FPY
97.4%
Batch / EPEI
12 / 1d
OEE
85.6%
i
FIFO
Insert a step here
+
I
22
0.92 d
Drag to reorder step 5
RUN-OFF BAY
5. Chute, Water Tan…
×2
FIFO Lane
C/T
24.0 min
C/O
15 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
6 / 1d
OEE
87.7%
i
Insert a step at the end
+
I
36
1.50 d
Finished Goods
OUT
2.08 d
VA 25.5 min
2.42 d
VA 31.9 min
2.79 d
VA 41.3 min
1.50 d
VA 30.8 min
0.92 d
VA 24.0 min
1.50 d
Total Lead Time
11.4 d
VA Time
2.6 h
PCE
1.50%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step