Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Pultruded FRP Crossflow Industrial Cooling Tower
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.36 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Axial FRP Fan & Gear Drive
9 < 14/day
Limit: downtime
Axial FRP Fan & Gear Drive: capacity 9/day vs demand 14/day. Main limit: downtime. Raw C/T 34.7 min, effective C/T 43.3 min.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,803,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
FRP profile supplier
FRP Structural Profiles…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
Business ERP
Batch Bake Queue Push
CUSTOMER
Industrial & HVAC Pla…
14 units/d
Takt: 32.1 min
EDI / Daily Truck
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
24
1.71 d
Drag to reorder step 1
COIL/STAMP
1. FRP Pultrusion M…
×2
Push Flow
C/T
21.9 min
C/O
35 min
Availability
93%
Quality FPY
98.7%
Batch / EPEI
21 / 2d
OEE
87.0%
i
Insert a step here
+
I
25
1.79 d
Drag to reorder step 2
WINDING HALL
2. Basin Seal & Dri…
×3
Push Flow
C/T
27.7 min
C/O
30 min
Availability
90%
Quality FPY
96.9%
Batch / EPEI
11 / 2d
OEE
79.8%
i
Insert a step here
+
I
31
2.21 d
SMED
Trickle U…
Drag to reorder step 3
THERMAL CELL
3. Axial FRP Fan & …
×3
BOTTLENECK
C/T
34.7 min
C/O
45 min
Availability
84%
Quality FPY
95.5%
Batch / EPEI
14 / 2d
OEE
72.2%
i
Insert a step here
+
I
15
1.07 d
Drag to reorder step 4
ASSEMBLY BAY
4. PVC Film-Fill Bl…
×3
FIFO Lane
C/T
25.1 min
C/O
15 min
Availability
94%
Quality FPY
98.3%
Batch / EPEI
6 / 1d
OEE
85.2%
i
FIFO
Insert a step here
+
I
11
0.79 d
Drag to reorder step 5
EOL QC
5. Vibration & Air-…
×2
Continuous Flow
C/T
19.3 min
C/O
8 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
3 / 1d
OEE
87.2%
i
Insert a step at the end
+
I
21
1.50 d
Finished Goods
OUT
1.71 d
VA 21.9 min
1.79 d
VA 27.7 min
2.21 d
VA 34.7 min
1.07 d
VA 25.1 min
0.79 d
VA 19.3 min
1.50 d
Total Lead Time
9.36 d
VA Time
2.1 h
PCE
3.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step