Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
32.1 min
Lead Time (LT)
9.36 d
Value-Added
2.1 h
Efficiency (PCE)
3.05%
BottleneckAxial FRP Fan & Gear Drive
9 < 14/day
Limit: downtime
Quality (RTY)
89.0%
WIP Capital
€1,803,400
Carbon CO₂
4.3 t CO₂e/year