Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Telescopic Hexagonal Mobile Crane Boom
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
50.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.16 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.39%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Tandem SAW Long Seam Weld
12 < 18/day
Limit: downtime
Tandem SAW Long Seam Weld: capacity 12/day vs demand 18/day. Main limit: downtime. Raw C/T 54.0 min, effective C/T 1.1 h.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€547,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
11.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
UHSS steel supplier
UHSS Fine-Grain Plate
2x / week · LT 4d
PRODUCTION CONTROL / ERP
Manufacturing ERP
Nesting Campaign Push
CUSTOMER
Mobile Crane OEMs
18 parts/d
Takt: 50.0 min
EDI / Daily
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
32
1.78 d
Drag to reorder step 1
CUTTING BAY
1. Bevel Plasma Lon…
×1
Push Flow
C/T
34.0 min
C/O
20 min
Availability
94%
Quality FPY
99.1%
Batch / EPEI
27 / 2d
OEE
91.8%
i
Insert a step here
+
I
22
1.22 d
Drag to reorder step 2
PREP BENCH
2. 1000T Tandem Pre…
×2
FIFO Lane
C/T
36.0 min
C/O
10 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
9 / 1d
OEE
91.4%
i
FIFO
Insert a step here
+
I
38
2.11 d
SMED
Segmented…
Drag to reorder step 3
FORMING CELL
3. Tandem SAW Long …
×4
BOTTLENECK
C/T
54.0 min
C/O
55 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
14 / 2d
OEE
73.7%
i
Insert a step here
+
I
31
1.72 d
Drag to reorder step 4
PAINT LINE
4. Phased-Array UT …
×2
Push Flow
C/T
42.0 min
C/O
35 min
Availability
90%
Quality FPY
96.8%
Batch / EPEI
22 / 2d
OEE
84.3%
i
Insert a step here
+
I
16
0.89 d
Drag to reorder step 5
FINAL CELL
5. Wear Pad Bore & …
×2
FIFO Lane
C/T
31.0 min
C/O
10 min
Availability
96%
Quality FPY
99.0%
Batch / EPEI
5 / 1d
OEE
91.2%
i
Insert a step at the end
+
I
22
1.22 d
Finished Goods
OUT
1.78 d
VA 34.0 min
1.22 d
VA 36.0 min
2.11 d
VA 54.0 min
1.72 d
VA 42.0 min
0.89 d
VA 31.0 min
1.22 d
Total Lead Time
9.16 d
VA Time
3.3 h
PCE
2.39%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step