Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Induction-Hardened 4-Cyl Forged Crankshaft
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
113 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.7 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.08%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Pin & Main Induction Harden
350 < 480/day
Limit: downtime
Pin & Main Induction Harden: capacity 350/day vs demand 480/day. Main limit: downtime. Raw C/T 2.0 min, effective C/T 2.5 min.
Quality (RTY)
90.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€847,440
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
47.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Crankshaft forge
38MnVS6 Forged Blanks
Weekly Rod Coil · LT 6d
PRODUCTION CONTROL / ERP
Automotive ERP
Campaign Heat-Treat Push
CUSTOMER
Commercial Diesel Eng…
480 parts/d
Takt: 113 s
EDI / Daily Pallet
MRP / Weekly Rod Coil
★ PACEMAKER
IN
Insert a step at the start
+
I
1,056
2.20 d
Drag to reorder step 1
HEADER LINE
1. Milling Mass-Cen…
×2
Push Flow
C/T
81 s
C/O
65 min
Availability
90%
Quality FPY
98.8%
Batch / EPEI
960 / 3d
OEE
85.7%
i
Insert a step here
+
I
864
1.80 d
Drag to reorder step 2
TOOTH/THREAD
2. Turn-Broach Main…
×2
Push Flow
C/T
95 s
C/O
45 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
720 / 2d
OEE
85.9%
i
Insert a step here
+
I
1,152
2.40 d
FLOW
Pull Cell…
Drag to reorder step 3
HEAT/GRIND
3. Pin & Main Induc…
×2
BOTTLENECK
C/T
2.0 min
C/O
50 min
Availability
84%
Quality FPY
96.1%
Batch / EPEI
720 / 3d
OEE
77.7%
i
Insert a step here
+
I
720
1.50 d
Drag to reorder step 4
PLATING BAY
4. CBN Orbital Cran…
×2
Push Flow
C/T
86 s
C/O
20 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
480 / 2d
OEE
89.5%
i
Insert a step here
+
I
384
0.80 d
Drag to reorder step 5
AUTO PACK
5. Superfinish Belt…
×1
FIFO Lane
C/T
63 s
C/O
12 min
Availability
97%
Quality FPY
99.6%
Batch / EPEI
240 / 1d
OEE
94.0%
i
Insert a step at the end
+
I
960
2.00 d
Finished Goods
OUT
2.20 d
VA 81 s
1.80 d
VA 95 s
2.40 d
VA 2.0 min
1.50 d
VA 86 s
0.80 d
VA 63 s
2.00 d
Total Lead Time
10.7 d
VA Time
7.4 min
PCE
0.08%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step