Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
IP69K Hygienic Stainless Food Delta Robot
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.36 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.69%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Direct-Drive Servo Seal Fit
20 < 28/day
Limit: downtime
Direct-Drive Servo Seal Fit: capacity 20/day vs demand 28/day. Main limit: downtime. Raw C/T 34.4 min, effective C/T 42.7 min.
Quality (RTY)
88.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,472,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
16.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Carbon Rods & 316L Ca…
Hygienic PEEK & Stainle…
Weekly · LT 9d
PRODUCTION CONTROL / ERP
Business ERP
Order Build Slot
CUSTOMER
Food & Bakery Pack Li…
28 units/d
Takt: 32.1 min
EDI / Custom Crating
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
50
1.79 d
Drag to reorder step 1
PARTS PREP
1. 316L Base Electr…
×2
Push Flow
C/T
22.5 min
C/O
25 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
22 / 2d
OEE
89.2%
i
Insert a step here
+
I
42
1.50 d
Drag to reorder step 2
JOINT CELL
2. Carbon Arm Ball-…
×3
Push Flow
C/T
27.0 min
C/O
20 min
Availability
92%
Quality FPY
97.2%
Batch / EPEI
11 / 1d
OEE
84.4%
i
Insert a step here
+
I
56
2.00 d
AUTOMATION
Multi-Bay…
Drag to reorder step 3
LASER BAY
3. Direct-Drive Ser…
×3
BOTTLENECK
C/T
34.4 min
C/O
30 min
Availability
85%
Quality FPY
94.8%
Batch / EPEI
14 / 1d
OEE
75.2%
i
Insert a step here
+
I
28
1.00 d
Drag to reorder step 4
CONTROL RACK
4. 2D Vision Belt S…
×2
FIFO Lane
C/T
24.4 min
C/O
12 min
Availability
95%
Quality FPY
98.0%
Batch / EPEI
7 / 1d
OEE
88.1%
i
FIFO
Insert a step here
+
I
20
0.71 d
Drag to reorder step 5
CERT PACK
5. 90-Pick/Min Wash…
×2
Continuous Flow
C/T
18.7 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
4 / 1d
OEE
88.7%
i
Insert a step at the end
+
I
34
1.21 d
Finished Goods
OUT
1.79 d
VA 22.5 min
1.50 d
VA 27.0 min
2.00 d
VA 34.4 min
1.00 d
VA 24.4 min
0.71 d
VA 18.7 min
1.21 d
Total Lead Time
8.36 d
VA Time
2.1 h
PCE
1.69%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step