Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Pre-Fabricated District Heating Substation Skid
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
8.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.20 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
32.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.79%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Orbital SS Pipe & Press-Fit
37 < 55/day
Limit: downtime
Orbital SS Pipe & Press-Fit: capacity 37/day vs demand 55/day. Main limit: downtime. Raw C/T 8.8 min, effective C/T 11.0 min.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,405,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
16.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Pump & heat-exchanger…
Insulated Valves & Bras…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
Business ERP
Batch Bake Queue Push
CUSTOMER
Municipal Energy Netw…
55 skids/d
Takt: 8.2 min
EDI / Daily Truck
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
94
1.71 d
Drag to reorder step 1
COIL/STAMP
1. Skid Steel Weld …
×2
Push Flow
C/T
5.6 min
C/O
35 min
Availability
93%
Quality FPY
98.7%
Batch / EPEI
83 / 2d
OEE
87.1%
i
Insert a step here
+
I
99
1.80 d
Drag to reorder step 2
WINDING HALL
2. Plate HX & VFD P…
×3
Push Flow
C/T
7.0 min
C/O
30 min
Availability
90%
Quality FPY
96.9%
Batch / EPEI
44 / 2d
OEE
79.9%
i
Insert a step here
+
I
121
2.20 d
SMED
Trickle U…
Drag to reorder step 3
THERMAL CELL
3. Orbital SS Pipe …
×3
BOTTLENECK
C/T
8.8 min
C/O
45 min
Availability
84%
Quality FPY
95.5%
Batch / EPEI
55 / 2d
OEE
72.2%
i
Insert a step here
+
I
61
1.11 d
Drag to reorder step 4
ASSEMBLY BAY
4. M-Bus Heat Meter…
×3
FIFO Lane
C/T
6.4 min
C/O
15 min
Availability
94%
Quality FPY
98.3%
Batch / EPEI
22 / 1d
OEE
84.7%
i
FIFO
Insert a step here
+
I
44
0.80 d
Drag to reorder step 5
EOL QC
5. 16-Bar Flush & I…
×2
Continuous Flow
C/T
4.9 min
C/O
8 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
11 / 1d
OEE
86.7%
i
Insert a step at the end
+
I
83
1.51 d
Finished Goods
OUT
1.71 d
VA 5.6 min
1.80 d
VA 7.0 min
2.20 d
VA 8.8 min
1.11 d
VA 6.4 min
0.80 d
VA 4.9 min
1.51 d
Total Lead Time
9.20 d
VA Time
32.7 min
PCE
0.79%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step