Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Quad-Laser Titanium LPBF Additive Cell
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
12.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.24 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
48.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.44%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Wire-EDM Cut & Powder Sieve
79 < 110/day
Limit: downtime
Wire-EDM Cut & Powder Sieve: capacity 79/day vs demand 110/day. Main limit: downtime. Raw C/T 13.1 min, effective C/T 16.3 min.
Quality (RTY)
88.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€414,920
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
66.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Additive powder suppl…
Gas-Atomized Ti64 Powder
Weekly · LT 9d
PRODUCTION CONTROL / ERP
Additive MES
Order Build Slot
CUSTOMER
MedTech & Aero Clients
110 parts/d
Takt: 12.3 min
EDI / Custom Crating
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
198
1.80 d
Drag to reorder step 1
PARTS PREP
1. Build-Plate Leve…
×2
Push Flow
C/T
8.6 min
C/O
25 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
88 / 2d
OEE
90.4%
i
Insert a step here
+
I
165
1.50 d
Drag to reorder step 2
JOINT CELL
2. Quad-Laser 60um …
×3
Push Flow
C/T
10.3 min
C/O
20 min
Availability
92%
Quality FPY
97.2%
Batch / EPEI
44 / 1d
OEE
86.1%
i
Insert a step here
+
I
220
2.00 d
AUTOMATION
Multi-Bay…
Drag to reorder step 3
LASER BAY
3. Wire-EDM Cut & P…
×3
BOTTLENECK
C/T
13.1 min
C/O
30 min
Availability
85%
Quality FPY
94.8%
Batch / EPEI
55 / 1d
OEE
77.0%
i
Insert a step here
+
I
110
1.00 d
Drag to reorder step 4
CONTROL RACK
4. Hot Isostatic Pr…
×2
FIFO Lane
C/T
9.3 min
C/O
12 min
Availability
95%
Quality FPY
98.0%
Batch / EPEI
28 / 1d
OEE
89.8%
i
FIFO
Insert a step here
+
I
77
0.70 d
Drag to reorder step 5
CERT PACK
5. CT-Scan Pore & T…
×2
Continuous Flow
C/T
7.1 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
17 / 1d
OEE
91.5%
i
Insert a step at the end
+
I
132
1.20 d
Finished Goods
OUT
1.80 d
VA 8.6 min
1.50 d
VA 10.3 min
2.00 d
VA 13.1 min
1.00 d
VA 9.3 min
0.70 d
VA 7.1 min
1.20 d
Total Lead Time
8.24 d
VA Time
48.5 min
PCE
0.44%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step