Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Cast-Iron Electric Counterbalance Forklift Build
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
13.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.3 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
56.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.56%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Triplex Mast & Tilt Ram Mate
42 < 65/day
Limit: downtime
Triplex Mast & Tilt Ram Mate: capacity 42/day vs demand 65/day. Main limit: downtime. Raw C/T 15.2 min, effective C/T 19.2 min.
Quality (RTY)
87.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€4,964,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
181.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
LFP Battery & Tractio…
Counterweight Cast & Ch…
Weekly · LT 10d
PRODUCTION CONTROL / ERP
Production ERP
Gantry Bottleneck Job-Shop
CUSTOMER
Logistics Warehouses
65 units/d
Takt: 13.8 min
EDI / Flatbed Convoy
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
137
2.11 d
Drag to reorder step 1
PLATE PREP
1. Chassis & Counte…
×3
Push Flow
C/T
9.4 min
C/O
30 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
98 / 2d
OEE
90.5%
i
Insert a step here
+
I
156
2.40 d
Drag to reorder step 2
WELD HALL
2. AC Drive Axle & …
×3
Push Flow
C/T
11.8 min
C/O
45 min
Availability
89%
Quality FPY
96.4%
Batch / EPEI
65 / 2d
OEE
81.5%
i
Insert a step here
+
I
182
2.80 d
SMED
Preset Br…
Drag to reorder step 3
GANTRY MILL
3. Triplex Mast & T…
×2
BOTTLENECK
C/T
15.2 min
C/O
90 min
Availability
83%
Quality FPY
95.8%
Batch / EPEI
65 / 3d
OEE
71.6%
i
Insert a step here
+
I
98
1.51 d
Drag to reorder step 4
BAY ASSEMBLY
4. LFP Pack Drop & …
×5
FIFO Lane
C/T
11.4 min
C/O
20 min
Availability
92%
Quality FPY
97.4%
Batch / EPEI
33 / 1d
OEE
85.7%
i
FIFO
Insert a step here
+
I
59
0.91 d
Drag to reorder step 5
RUN-OFF BAY
5. Tilt Stability &…
×2
FIFO Lane
C/T
8.9 min
C/O
15 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
16 / 1d
OEE
87.6%
i
Insert a step at the end
+
I
98
1.51 d
Finished Goods
OUT
2.11 d
VA 9.4 min
2.40 d
VA 11.8 min
2.80 d
VA 15.2 min
1.51 d
VA 11.4 min
0.91 d
VA 8.9 min
1.51 d
Total Lead Time
11.3 d
VA Time
56.6 min
PCE
0.56%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step