Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
4.7 min
Lead Time (LT)
8.72 d
Value-Added
18.8 min
Efficiency (PCE)
0.24%
BottleneckGear Tooth Grind
135 < 190/day
Limit: downtime
Quality (RTY)
89.1%
WIP Capital
€1,057,920
Carbon CO₂
92.3 t CO₂e/year