Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
SAE 100R15 Spiral Hydraulic Hose Assembly
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
39 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.70 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.03%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Laser Marker Crimp Depth Set
998 < 1,400/day
Limit: downtime
Laser Marker Crimp Depth Set: capacity 998/day vs demand 1,400/day. Main limit: downtime. Raw C/T 41 s, effective C/T 51 s.
Quality (RTY)
89.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€511,560
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
680.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Hose & coupling suppl…
4-Spiral Rubber & Steel…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
Business ERP
Batch Honing & Chrome Queue
CUSTOMER
OEM Hose Kitting Lines
1,400 units/d
Takt: 39 s
EDI / Daily Crate
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
2,240
1.60 d
Drag to reorder step 1
TURN PREP
1. Orbital Cut & In…
×2
Push Flow
C/T
26 s
C/O
25 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
1400 / 2d
OEE
91.3%
i
Insert a step here
+
I
2,380
1.70 d
Drag to reorder step 2
CNC CELL
2. Ultrasonic Foam …
×2
Push Flow
C/T
32 s
C/O
38 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
1120 / 2d
OEE
84.1%
i
Insert a step here
+
I
3,080
2.20 d
QUALITY
In-Proces…
Drag to reorder step 3
SURFACE/HONE
3. Laser Marker Cri…
×2
BOTTLENECK
C/T
41 s
C/O
45 min
Availability
84%
Quality FPY
95.0%
Batch / EPEI
1400 / 2d
OEE
75.8%
i
Insert a step here
+
I
1,400
1.00 d
Drag to reorder step 4
CLEAN BAY
4. 840-Bar Impulse …
×2
FIFO Lane
C/T
30 s
C/O
15 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
560 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
980
0.70 d
Drag to reorder step 5
HYDRO QC
5. Barcoded Cap & K…
×2
FIFO Lane
C/T
24 s
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
280 / 1d
OEE
89.9%
i
Insert a step at the end
+
I
2,100
1.50 d
Finished Goods
OUT
1.60 d
VA 26 s
1.70 d
VA 32 s
2.20 d
VA 41 s
1.00 d
VA 30 s
0.70 d
VA 24 s
1.50 d
Total Lead Time
8.70 d
VA Time
2.5 min
PCE
0.03%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step