Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Double-Acting Telescopic Chrome Cylinder
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.72 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
16.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.21%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Friction-Weld Eye & Port Weld
156 < 220/day
Limit: downtime
Friction-Weld Eye & Port Weld: capacity 156/day vs demand 220/day. Main limit: downtime. Raw C/T 4.4 min, effective C/T 5.5 min.
Quality (RTY)
89.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€593,340
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
106.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Seamless honed tube s…
C45 Chrome Rod & St52 T…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
Business ERP
Batch Honing & Chrome Queue
CUSTOMER
Earthmoving OEMs
220 units/d
Takt: 4.1 min
EDI / Daily Crate
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
352
1.60 d
Drag to reorder step 1
TURN PREP
1. Tube Cut & Skive…
×2
Push Flow
C/T
2.7 min
C/O
25 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
220 / 2d
OEE
91.3%
i
Insert a step here
+
I
374
1.70 d
Drag to reorder step 2
CNC CELL
2. Induction-Hard C…
×2
Push Flow
C/T
3.4 min
C/O
38 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
176 / 2d
OEE
84.1%
i
Insert a step here
+
I
484
2.20 d
QUALITY
In-Proces…
Drag to reorder step 3
SURFACE/HONE
3. Friction-Weld Ey…
×2
BOTTLENECK
C/T
4.4 min
C/O
45 min
Availability
84%
Quality FPY
95.0%
Batch / EPEI
220 / 2d
OEE
75.8%
i
Insert a step here
+
I
220
1.00 d
Drag to reorder step 4
CLEAN BAY
4. Seal Gland Torqu…
×2
FIFO Lane
C/T
3.2 min
C/O
15 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
88 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
154
0.70 d
Drag to reorder step 5
HYDRO QC
5. 300-Bar Drift & …
×2
FIFO Lane
C/T
2.5 min
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
44 / 1d
OEE
89.9%
i
Insert a step at the end
+
I
330
1.50 d
Finished Goods
OUT
1.60 d
VA 2.7 min
1.70 d
VA 3.4 min
2.20 d
VA 4.4 min
1.00 d
VA 3.2 min
0.70 d
VA 2.5 min
1.50 d
Total Lead Time
8.72 d
VA Time
16.2 min
PCE
0.21%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step