Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
PE-1200 Heavy Primary Quarry Jaw Crusher Frame
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.5 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
12.4 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
6.59%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
18% Mn Pitman Jaw Casting Fit
3 < 5/day
Limit: changeovers
18% Mn Pitman Jaw Casting Fit: capacity 3/day vs demand 5/day. Main limit: changeovers. Raw C/T 1.7 h, effective C/T 2.1 h.
Quality (RTY)
87.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,508,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
13.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
18% Mn Steel Foundry
Forged Eccentric Shafts…
Weekly · LT 10d
PRODUCTION CONTROL / ERP
Business ERP
Gantry Bottleneck Job-Shop
CUSTOMER
Mine Aggregate Operat…
5 units/d
Takt: 1.5 h
EDI / Flatbed Convoy
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
11
2.20 d
Drag to reorder step 1
PLATE PREP
1. Side-Plate Bolt …
×3
Push Flow
C/T
1.0 h
C/O
30 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
8 / 2d
OEE
88.7%
i
Insert a step here
+
I
12
2.40 d
Drag to reorder step 2
WELD HALL
2. Giant CNC Eccent…
×3
Push Flow
C/T
1.3 h
C/O
45 min
Availability
89%
Quality FPY
96.4%
Batch / EPEI
5 / 2d
OEE
77.2%
i
Insert a step here
+
I
14
2.80 d
SMED
Preset Br…
Drag to reorder step 3
GANTRY MILL
3. 18% Mn Pitman Ja…
×2
BOTTLENECK
C/T
1.7 h
C/O
90 min
Availability
83%
Quality FPY
95.8%
Batch / EPEI
5 / 3d
OEE
63.6%
i
Insert a step here
+
I
8
1.60 d
Drag to reorder step 4
BAY ASSEMBLY
4. Flywheel Taper S…
×5
FIFO Lane
C/T
1.2 h
C/O
20 min
Availability
92%
Quality FPY
97.4%
Batch / EPEI
3 / 1d
OEE
83.0%
i
FIFO
Insert a step here
+
I
5
1.00 d
Drag to reorder step 5
RUN-OFF BAY
5. No-Load Vibratio…
×2
FIFO Lane
C/T
57.6 min
C/O
15 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
1 / 1d
OEE
90.8%
i
Insert a step at the end
+
I
8
1.60 d
Finished Goods
OUT
2.20 d
VA 1.0 h
2.40 d
VA 1.3 h
2.80 d
VA 1.7 h
1.60 d
VA 1.2 h
1.00 d
VA 57.6 min
1.60 d
Total Lead Time
12.4 d
VA Time
6.1 h
PCE
6.59%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step