Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Commercial UL Grease-Filter Exhaust Hood
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
12.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.06 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
50.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.24%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Grind & #4 Satin Polish
22 < 35/day
Limit: changeovers
Grind & #4 Satin Polish: capacity 22/day vs demand 35/day. Main limit: changeovers. Raw C/T 13.9 min, effective C/T 17.4 min.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€244,140
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
22.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Brushed 304SS Mills
18-Gauge 304 Stainless
2x / week · LT 4d
PRODUCTION CONTROL / ERP
Business ERP
Nesting Campaign Push
CUSTOMER
Commercial Kitchen Bu…
35 units/d
Takt: 12.9 min
EDI / Daily
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
63
1.80 d
Drag to reorder step 1
CUTTING BAY
1. CNC Shear & Corn…
×1
Push Flow
C/T
8.8 min
C/O
20 min
Availability
94%
Quality FPY
99.1%
Batch / EPEI
53 / 2d
OEE
90.4%
i
Insert a step here
+
I
42
1.20 d
Drag to reorder step 2
PREP BENCH
2. TIG Liquid-Tight…
×2
FIFO Lane
C/T
9.3 min
C/O
10 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
18 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
74
2.11 d
SMED
Segmented…
Drag to reorder step 3
FORMING CELL
3. Grind & #4 Satin…
×4
BOTTLENECK
C/T
13.9 min
C/O
55 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
28 / 2d
OEE
67.8%
i
Insert a step here
+
I
60
1.71 d
Drag to reorder step 4
PAINT LINE
4. Baffle & Fire No…
×2
Push Flow
C/T
10.8 min
C/O
35 min
Availability
90%
Quality FPY
96.8%
Batch / EPEI
42 / 2d
OEE
81.5%
i
Insert a step here
+
I
32
0.91 d
Drag to reorder step 5
FINAL CELL
5. White-Glove Crat…
×2
FIFO Lane
C/T
8.0 min
C/O
10 min
Availability
96%
Quality FPY
99.0%
Batch / EPEI
11 / 1d
OEE
88.3%
i
Insert a step at the end
+
I
42
1.20 d
Finished Goods
OUT
1.80 d
VA 8.8 min
1.20 d
VA 9.3 min
2.11 d
VA 13.9 min
1.71 d
VA 10.8 min
0.91 d
VA 8.0 min
1.20 d
Total Lead Time
9.06 d
VA Time
50.7 min
PCE
1.24%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step