Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Active Magnetic Bearing Turbo-Expander Cartridge
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
20.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.9 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.65%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Vacuum Potting Epoxy Bake
15 < 22/day
Limit: downtime
Vacuum Potting Epoxy Bake: capacity 15/day vs demand 22/day. Main limit: downtime. Raw C/T 21.9 min, effective C/T 27.1 min.
Quality (RTY)
90.8%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€896,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Silicon steel supplier
NO20 Si-Steel Laminatio…
Weekly Rod Coil · LT 6d
PRODUCTION CONTROL / ERP
Production ERP
Campaign Heat-Treat Push
CUSTOMER
Cryogenic & Gas Compr…
22 units/d
Takt: 20.5 min
EDI / Daily Pallet
MRP / Weekly Rod Coil
★ PACEMAKER
IN
Insert a step at the start
+
I
48
2.18 d
Drag to reorder step 1
HEADER LINE
1. Laser Cut Stator…
×2
Push Flow
C/T
14.7 min
C/O
65 min
Availability
90%
Quality FPY
98.8%
Batch / EPEI
44 / 3d
OEE
82.5%
i
Insert a step here
+
I
40
1.82 d
Drag to reorder step 2
TOOTH/THREAD
2. High-Temp Polyim…
×2
Push Flow
C/T
17.2 min
C/O
45 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
33 / 2d
OEE
82.9%
i
Insert a step here
+
I
53
2.41 d
FLOW
Pull Cell…
Drag to reorder step 3
HEAT/GRIND
3. Vacuum Potting E…
×2
BOTTLENECK
C/T
21.9 min
C/O
50 min
Availability
84%
Quality FPY
96.1%
Batch / EPEI
33 / 3d
OEE
74.7%
i
Insert a step here
+
I
33
1.50 d
Drag to reorder step 4
PLATING BAY
4. EDM Air-Gap Touc…
×2
Push Flow
C/T
15.6 min
C/O
20 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
22 / 2d
OEE
87.4%
i
Insert a step here
+
I
18
0.82 d
Drag to reorder step 5
AUTO PACK
5. 5-Axis Levitatio…
×1
FIFO Lane
C/T
11.5 min
C/O
12 min
Availability
97%
Quality FPY
99.6%
Batch / EPEI
11 / 1d
OEE
91.5%
i
Insert a step at the end
+
I
44
2.00 d
Finished Goods
OUT
2.18 d
VA 14.7 min
1.82 d
VA 17.2 min
2.41 d
VA 21.9 min
1.50 d
VA 15.6 min
0.82 d
VA 11.5 min
2.00 d
Total Lead Time
10.9 d
VA Time
1.3 h
PCE
1.65%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step