Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
56.3 min
Lead Time (LT)
9.63 d
Value-Added
3.8 h
Efficiency (PCE)
5.20%
BottleneckHVOF Sand-Erosion Coat
5 < 8/day
Limit: downtime
Quality (RTY)
89.0%
WIP Capital
€649,700
Carbon CO₂
2.4 t CO₂e/year