Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
4-High Cold Steel Rolling Mill Housing Stand
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.8 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
13.5 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
15.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
15.10%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Chock Window Liner Slide Fit
1 < 2/day
Limit: changeovers
Chock Window Liner Slide Fit: capacity 1/day vs demand 2/day. Main limit: changeovers. Raw C/T 4.1 h, effective C/T 5.2 h.
Quality (RTY)
87.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,185,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
5.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Heavy Cast Steel Works
GS-52 Cast Mill Windows
Weekly · LT 10d
PRODUCTION CONTROL / ERP
Engineer-to-order ERP
Gantry Bottleneck Job-Shop
CUSTOMER
Flat Steel Rollers
2 units/d
Takt: 3.8 h
EDI / Flatbed Convoy
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
4
2.00 d
Drag to reorder step 1
PLATE PREP
1. Cast Window UT &…
×3
Push Flow
C/T
2.6 h
C/O
30 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
3 / 2d
OEE
88.5%
i
Insert a step here
+
I
5
2.50 d
Drag to reorder step 2
WELD HALL
2. Giant Horizontal…
×3
Push Flow
C/T
3.2 h
C/O
45 min
Availability
89%
Quality FPY
96.4%
Batch / EPEI
2 / 2d
OEE
77.2%
i
Insert a step here
+
I
6
3.00 d
SMED
Preset Br…
Drag to reorder step 3
GANTRY MILL
3. Chock Window Lin…
×2
BOTTLENECK
C/T
4.1 h
C/O
90 min
Availability
83%
Quality FPY
95.8%
Batch / EPEI
2 / 3d
OEE
63.6%
i
Insert a step here
+
I
3
1.50 d
Drag to reorder step 4
BAY ASSEMBLY
4. AGC Hydraulic Sc…
×5
FIFO Lane
C/T
3.1 h
C/O
20 min
Availability
92%
Quality FPY
97.4%
Batch / EPEI
1 / 1d
OEE
85.6%
i
FIFO
Insert a step here
+
I
2
1.00 d
Drag to reorder step 5
RUN-OFF BAY
5. Zero-Deflection …
×2
FIFO Lane
C/T
2.4 h
C/O
15 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
1 / 1d
OEE
90.8%
i
Insert a step at the end
+
I
3
1.50 d
Finished Goods
OUT
2.00 d
VA 2.6 h
2.50 d
VA 3.2 h
3.00 d
VA 4.1 h
1.50 d
VA 3.1 h
1.00 d
VA 2.4 h
1.50 d
Total Lead Time
13.5 d
VA Time
15.3 h
PCE
15.10%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step