Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.5 h
Lead Time (LT)
12.7 d
Value-Added
10.2 h
Efficiency (PCE)
10.74%
Bottleneck7m Vertical Boring Mill Face
2 < 3/day
Limit: changeovers
Quality (RTY)
87.6%
WIP Capital
€1,972,000
Carbon CO₂
8.4 t CO₂e/year