Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
42U Hyperscale Data Center Rack Enclosure
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.92 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
19.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.25%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Automated Press-Brake Cell
123 < 180/day
Limit: downtime
Automated Press-Brake Cell: capacity 123/day vs demand 180/day. Main limit: downtime. Raw C/T 5.4 min, effective C/T 6.8 min.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€384,480
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
114.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Cold-rolled steel mill
Cold-Rolled DC01 Coils
2x / week · LT 4d
PRODUCTION CONTROL / ERP
Manufacturing ERP
Nesting Campaign Push
CUSTOMER
Cloud Data Center Int…
180 units/d
Takt: 5.0 min
EDI / Daily
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
324
1.80 d
Drag to reorder step 1
CUTTING BAY
1. Turret Punch & L…
×1
Push Flow
C/T
3.4 min
C/O
20 min
Availability
94%
Quality FPY
99.1%
Batch / EPEI
270 / 2d
OEE
91.8%
i
Insert a step here
+
I
216
1.20 d
Drag to reorder step 2
PREP BENCH
2. Side-Post Weld &…
×2
FIFO Lane
C/T
3.6 min
C/O
10 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
90 / 1d
OEE
91.4%
i
FIFO
Insert a step here
+
I
378
2.10 d
SMED
Segmented…
Drag to reorder step 3
FORMING CELL
3. Automated Press-…
×4
BOTTLENECK
C/T
5.4 min
C/O
55 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
144 / 2d
OEE
73.9%
i
Insert a step here
+
I
306
1.70 d
Drag to reorder step 4
PAINT LINE
4. Conductive Powde…
×2
Push Flow
C/T
4.2 min
C/O
35 min
Availability
90%
Quality FPY
96.8%
Batch / EPEI
216 / 2d
OEE
84.3%
i
Insert a step here
+
I
162
0.90 d
Drag to reorder step 5
FINAL CELL
5. Caster, Lock & D…
×2
FIFO Lane
C/T
3.1 min
C/O
10 min
Availability
96%
Quality FPY
99.0%
Batch / EPEI
54 / 1d
OEE
91.5%
i
Insert a step at the end
+
I
216
1.20 d
Finished Goods
OUT
1.80 d
VA 3.4 min
1.20 d
VA 3.6 min
2.10 d
VA 5.4 min
1.70 d
VA 4.2 min
0.90 d
VA 3.1 min
1.20 d
Total Lead Time
8.92 d
VA Time
19.7 min
PCE
0.25%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step