Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.3 h
Lead Time (LT)
11.8 d
Value-Added
5.1 h
Efficiency (PCE)
5.75%
BottleneckEpoxy Marine Coating 450um
3 < 6/day
Limit: changeovers
Quality (RTY)
87.6%
WIP Capital
€2,278,000
Carbon CO₂
16.7 t CO₂e/year