Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
18.8 min
Lead Time (LT)
8.87 d
Value-Added
1.2 h
Efficiency (PCE)
1.86%
BottleneckNatural Rubber Liner Mold
16 < 24/day
Limit: downtime
Quality (RTY)
89.1%
WIP Capital
€668,800
Carbon CO₂
11.7 t CO₂e/year