Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Torque-Tube Roll-Formed Solar Tracker Beam
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
87 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.91 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.07%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Flying Laser Hole Pierce
424 < 620/day
Limit: downtime
Flying Laser Hole Pierce: capacity 424/day vs demand 620/day. Main limit: downtime. Raw C/T 94 s, effective C/T 118 s.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€606,980
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
394.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Strip steel supplier
S350GD High-Yield Coil
2x / week · LT 4d
PRODUCTION CONTROL / ERP
Production ERP
Nesting Campaign Push
CUSTOMER
Utility Solar EPC Sit…
620 parts/d
Takt: 87 s
EDI / Daily
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
1,116
1.80 d
Drag to reorder step 1
CUTTING BAY
1. High-Speed Coil …
×1
Push Flow
C/T
59 s
C/O
20 min
Availability
94%
Quality FPY
99.1%
Batch / EPEI
930 / 2d
OEE
91.8%
i
Insert a step here
+
I
744
1.20 d
Drag to reorder step 2
PREP BENCH
2. 16-Pass Octagona…
×2
FIFO Lane
C/T
63 s
C/O
10 min
Availability
95%
Quality FPY
98.4%
Batch / EPEI
310 / 1d
OEE
91.4%
i
FIFO
Insert a step here
+
I
1,302
2.10 d
SMED
Segmented…
Drag to reorder step 3
FORMING CELL
3. Flying Laser Hol…
×4
BOTTLENECK
C/T
94 s
C/O
55 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
496 / 2d
OEE
73.9%
i
Insert a step here
+
I
1,054
1.70 d
Drag to reorder step 4
PAINT LINE
4. Flange Plate Mag…
×2
Push Flow
C/T
73 s
C/O
35 min
Availability
90%
Quality FPY
96.8%
Batch / EPEI
744 / 2d
OEE
84.3%
i
Insert a step here
+
I
558
0.90 d
Drag to reorder step 5
FINAL CELL
5. Bundle Strapping…
×2
FIFO Lane
C/T
54 s
C/O
10 min
Availability
96%
Quality FPY
99.0%
Batch / EPEI
186 / 1d
OEE
91.5%
i
Insert a step at the end
+
I
744
1.20 d
Finished Goods
OUT
1.80 d
VA 59 s
1.20 d
VA 63 s
2.10 d
VA 94 s
1.70 d
VA 73 s
0.90 d
VA 54 s
1.20 d
Total Lead Time
8.91 d
VA Time
5.7 min
PCE
0.07%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step