Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
72 s
Lead Time (LT)
10.7 d
Value-Added
4.7 min
Efficiency (PCE)
0.05%
BottleneckMulti-Spindle Bolt-Hole Drill
545 < 750/day
Limit: downtime
Quality (RTY)
90.8%
WIP Capital
€465,450
Carbon CO₂
74.1 t CO₂e/year