Fire-Tube Condensing 5-Ton Steam Boiler
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
56.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.63 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.8 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
5.20%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
100% Weld Radiographic NDT
5 < 8/day
Limit: downtime
100% Weld Radiographic NDT: capacity 5/day vs demand 8/day. Main limit: downtime. Raw C/T 1.0 h, effective C/T 1.3 h.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,533,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Seamless tube supplier
P265GH Boiler Steel Pla…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
Engineer-to-order ERP
Batch Bake Queue Push
CUSTOMER
Food, Textile & Pharm…
8 units/d
Takt: 56.3 min
EDI / Daily Truck
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
14
1.75 d
Drag to reorder step 1
COIL/STAMP
1. Shell Roll & Fur…
×2
Push Flow
C/T
38.3 min
C/O
35 min
Availability
93%
Quality FPY
98.7%
Batch / EPEI
12 / 2d
OEE
87.0%
i
Insert a step here
+
I
14
1.75 d
Drag to reorder step 2
WINDING HALL
2. TIG Tube-Sheet E…
×3
Push Flow
C/T
48.4 min
C/O
30 min
Availability
90%
Quality FPY
96.9%
Batch / EPEI
6 / 2d
OEE
79.5%
i
Insert a step here
+
I
18
2.25 d
SMED
Trickle U…
Drag to reorder step 3
THERMAL CELL
3. 100% Weld Radiog…
×3
BOTTLENECK
C/T
1.0 h
C/O
45 min
Availability
84%
Quality FPY
95.5%
Batch / EPEI
8 / 2d
OEE
72.2%
i
Insert a step here
+
I
9
1.13 d
Drag to reorder step 4
ASSEMBLY BAY
4. Ceramic Blanket …
×3
FIFO Lane
C/T
43.9 min
C/O
15 min
Availability
94%
Quality FPY
98.3%
Batch / EPEI
3 / 1d
OEE
84.2%
i
FIFO
Insert a step here
+
I
6
0.75 d
Drag to reorder step 5
EOL QC
5. ASME Hydro & Bur…
×2
Continuous Flow
C/T
33.8 min
C/O
8 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
88.4%
i
Insert a step at the end
+
I
12
1.50 d
Finished Goods
OUT
1.75 d
VA 38.3 min
1.75 d
VA 48.4 min
2.25 d
VA 1.0 h
1.13 d
VA 43.9 min
0.75 d
VA 33.8 min
1.50 d
Total Lead Time
9.63 d
VA Time
3.8 h
PCE
5.20%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step