Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
API-600 Forged Carbon Steel Steam Globe Valve
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
10.6 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.75 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
42.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.53%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Precision Lap Plug & Seat
60 < 85/day
Limit: downtime
Precision Lap Plug & Seat: capacity 60/day vs demand 85/day. Main limit: downtime. Raw C/T 11.3 min, effective C/T 14.2 min.
Quality (RTY)
89.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€547,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
41.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Forged A105 Steel
Forged Bodies & Cobalt-…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
Production ERP
Batch Honing & Chrome Queue
CUSTOMER
Power & Petrochem Pla…
85 units/d
Takt: 10.6 min
EDI / Daily Crate
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
136
1.60 d
Drag to reorder step 1
TURN PREP
1. Body Flange Face…
×2
Push Flow
C/T
7.0 min
C/O
25 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
85 / 2d
OEE
91.3%
i
Insert a step here
+
I
145
1.71 d
Drag to reorder step 2
CNC CELL
2. Cobalt-Alloy Har…
×2
Push Flow
C/T
8.9 min
C/O
38 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
68 / 2d
OEE
84.1%
i
Insert a step here
+
I
187
2.20 d
QUALITY
In-Proces…
Drag to reorder step 3
SURFACE/HONE
3. Precision Lap Pl…
×2
BOTTLENECK
C/T
11.3 min
C/O
45 min
Availability
84%
Quality FPY
95.0%
Batch / EPEI
85 / 2d
OEE
75.8%
i
Insert a step here
+
I
85
1.00 d
Drag to reorder step 4
CLEAN BAY
4. Bonnet Graphite …
×2
FIFO Lane
C/T
8.3 min
C/O
15 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
34 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
59
0.69 d
Drag to reorder step 5
HYDRO QC
5. API-598 Shell & …
×2
FIFO Lane
C/T
6.6 min
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
17 / 1d
OEE
89.9%
i
Insert a step at the end
+
I
128
1.51 d
Finished Goods
OUT
1.60 d
VA 7.0 min
1.71 d
VA 8.9 min
2.20 d
VA 11.3 min
1.00 d
VA 8.3 min
0.69 d
VA 6.6 min
1.51 d
Total Lead Time
8.75 d
VA Time
42.1 min
PCE
0.53%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step