Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
18.8 min
Lead Time (LT)
9.19 d
Value-Added
1.3 h
Efficiency (PCE)
0.91%
BottleneckVacuum Casting Epoxy Mold
34 < 48/day
Limit: downtime
Quality (RTY)
89.0%
WIP Capital
€830,300
Carbon CO₂
14.6 t CO₂e/year