Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Proportional Electro-Hydraulic Valve Bank
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.71 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
12.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.16%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Diamond Hone Spool Bore
206 < 290/day
Limit: downtime
Diamond Hone Spool Bore: capacity 206/day vs demand 290/day. Main limit: downtime. Raw C/T 3.3 min, effective C/T 4.2 min.
Quality (RTY)
89.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€908,280
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
140.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Cast Iron & Forged St…
EN-GJS-400 Blocks & Spo…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
Production ERP
Batch Honing & Chrome Queue
CUSTOMER
Crane & Forestry Buil…
290 units/d
Takt: 3.1 min
EDI / Daily Crate
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
464
1.60 d
Drag to reorder step 1
TURN PREP
1. 5-Axis Deep Port…
×2
Push Flow
C/T
2.1 min
C/O
25 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
290 / 2d
OEE
91.3%
i
Insert a step here
+
I
493
1.70 d
Drag to reorder step 2
CNC CELL
2. EDM Proportional…
×2
Push Flow
C/T
2.6 min
C/O
38 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
232 / 2d
OEE
84.1%
i
Insert a step here
+
I
638
2.20 d
QUALITY
In-Proces…
Drag to reorder step 3
SURFACE/HONE
3. Diamond Hone Spo…
×2
BOTTLENECK
C/T
3.3 min
C/O
45 min
Availability
84%
Quality FPY
95.0%
Batch / EPEI
290 / 2d
OEE
75.8%
i
Insert a step here
+
I
290
1.00 d
Drag to reorder step 4
CLEAN BAY
4. Clean Bench CAN …
×2
FIFO Lane
C/T
2.4 min
C/O
15 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
116 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
203
0.70 d
Drag to reorder step 5
HYDRO QC
5. Oil Hysteresis &…
×2
FIFO Lane
C/T
115 s
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
58 / 1d
OEE
89.9%
i
Insert a step at the end
+
I
435
1.50 d
Finished Goods
OUT
1.60 d
VA 2.1 min
1.70 d
VA 2.6 min
2.20 d
VA 3.3 min
1.00 d
VA 2.4 min
0.70 d
VA 115 s
1.50 d
Total Lead Time
8.71 d
VA Time
12.3 min
PCE
0.16%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step