Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
AI Hyperspectral Optical Food & Plastic Sorter
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
28.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.43 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.93%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
256 High-Speed Air Valve Bar
10 < 16/day
Limit: changeovers
256 High-Speed Air Valve Bar: capacity 10/day vs demand 16/day. Main limit: changeovers. Raw C/T 30.1 min, effective C/T 37.4 min.
Quality (RTY)
88.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,161,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
9.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
NIR camera supplier
LED Arrays & Piezo Air …
Weekly · LT 9d
PRODUCTION CONTROL / ERP
Business ERP
Order Build Slot
CUSTOMER
Agri & Recycling Plan…
16 units/d
Takt: 28.1 min
EDI / Custom Crating
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
29
1.81 d
Drag to reorder step 1
PARTS PREP
1. Stainless Chute …
×2
Push Flow
C/T
19.7 min
C/O
25 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
13 / 2d
OEE
86.2%
i
Insert a step here
+
I
24
1.50 d
Drag to reorder step 2
JOINT CELL
2. NIR/RGB Optical …
×3
Push Flow
C/T
23.6 min
C/O
20 min
Availability
92%
Quality FPY
97.2%
Batch / EPEI
6 / 1d
OEE
78.8%
i
Insert a step here
+
I
32
2.00 d
AUTOMATION
Multi-Bay…
Drag to reorder step 3
LASER BAY
3. 256 High-Speed A…
×3
BOTTLENECK
C/T
30.1 min
C/O
30 min
Availability
85%
Quality FPY
94.8%
Batch / EPEI
8 / 1d
OEE
69.8%
i
Insert a step here
+
I
16
1.00 d
Drag to reorder step 4
CONTROL RACK
4. FPGA Model & Del…
×2
FIFO Lane
C/T
21.4 min
C/O
12 min
Availability
95%
Quality FPY
98.0%
Batch / EPEI
4 / 1d
OEE
83.2%
i
FIFO
Insert a step here
+
I
11
0.69 d
Drag to reorder step 5
CERT PACK
5. Defect Rejection…
×2
Continuous Flow
C/T
16.3 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
79.0%
i
Insert a step at the end
+
I
19
1.19 d
Finished Goods
OUT
1.81 d
VA 19.7 min
1.50 d
VA 23.6 min
2.00 d
VA 30.1 min
1.00 d
VA 21.4 min
0.69 d
VA 16.3 min
1.19 d
Total Lead Time
8.43 d
VA Time
1.9 h
PCE
2.93%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step