Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
28.1 min
Lead Time (LT)
8.43 d
Value-Added
1.9 h
Efficiency (PCE)
2.93%
Bottleneck256 High-Speed Air Valve Bar
10 < 16/day
Limit: changeovers
Quality (RTY)
88.1%
WIP Capital
€2,161,500
Carbon CO₂
9.7 t CO₂e/year