Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Commercial Heat-Recovery VRF Outdoor Unit
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.7 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.12 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
19.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.23%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Automated Vacuum & R32 Charge
134 < 190/day
Limit: downtime
Automated Vacuum & R32 Charge: capacity 134/day vs demand 190/day. Main limit: downtime. Raw C/T 5.1 min, effective C/T 6.4 min.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,852,850
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
57.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
R32 Compressors & Cu …
Hydrophilic Al Fin & Cu…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
Manufacturing ERP
Batch Bake Queue Push
CUSTOMER
Commercial Tower Cont…
190 units/d
Takt: 4.7 min
EDI / Daily Truck
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
323
1.70 d
Drag to reorder step 1
COIL/STAMP
1. Copper Fin-Coil …
×2
Push Flow
C/T
3.2 min
C/O
35 min
Availability
93%
Quality FPY
98.7%
Batch / EPEI
285 / 2d
OEE
89.4%
i
Insert a step here
+
I
342
1.80 d
Drag to reorder step 2
WINDING HALL
2. Twin-Inverter Co…
×3
Push Flow
C/T
4.1 min
C/O
30 min
Availability
90%
Quality FPY
96.9%
Batch / EPEI
152 / 2d
OEE
83.6%
i
Insert a step here
+
I
418
2.20 d
SMED
Trickle U…
Drag to reorder step 3
THERMAL CELL
3. Automated Vacuum…
×3
BOTTLENECK
C/T
5.1 min
C/O
45 min
Availability
84%
Quality FPY
95.5%
Batch / EPEI
190 / 2d
OEE
76.2%
i
Insert a step here
+
I
209
1.10 d
Drag to reorder step 4
ASSEMBLY BAY
4. Halogen Sniffer …
×3
FIFO Lane
C/T
3.7 min
C/O
15 min
Availability
94%
Quality FPY
98.3%
Batch / EPEI
76 / 1d
OEE
88.6%
i
FIFO
Insert a step here
+
I
152
0.80 d
Drag to reorder step 5
EOL QC
5. 3-Mode Heat/Cool…
×2
Continuous Flow
C/T
2.9 min
C/O
8 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
38 / 1d
OEE
90.9%
i
Insert a step at the end
+
I
285
1.50 d
Finished Goods
OUT
1.70 d
VA 3.2 min
1.80 d
VA 4.1 min
2.20 d
VA 5.1 min
1.10 d
VA 3.7 min
0.80 d
VA 2.9 min
1.50 d
Total Lead Time
9.12 d
VA Time
19.0 min
PCE
0.23%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step