Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
20-Ton Articulated Quarry Wheel Loader
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.1 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.5 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.54%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Axle, Trans & Engine Drop
9 < 14/day
Limit: downtime
Axle, Trans & Engine Drop: capacity 9/day vs demand 14/day. Main limit: downtime. Raw C/T 1.2 h, effective C/T 1.5 h.
Quality (RTY)
87.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€6,594,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
39.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Axle & engine supplier
Plate Chassis & Z-Bar A…
Weekly · LT 10d
PRODUCTION CONTROL / ERP
Manufacturing ERP
Gantry Bottleneck Job-Shop
CUSTOMER
Mining & Quarry Deale…
14 units/d
Takt: 1.1 h
EDI / Flatbed Convoy
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
29
2.07 d
Drag to reorder step 1
PLATE PREP
1. Front/Rear Artic…
×3
Push Flow
C/T
43.7 min
C/O
30 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
21 / 2d
OEE
90.5%
i
Insert a step here
+
I
34
2.43 d
Drag to reorder step 2
WELD HALL
2. Z-Bar Linkage Bo…
×3
Push Flow
C/T
54.7 min
C/O
45 min
Availability
89%
Quality FPY
96.4%
Batch / EPEI
14 / 2d
OEE
81.5%
i
Insert a step here
+
I
39
2.79 d
SMED
Preset Br…
Drag to reorder step 3
GANTRY MILL
3. Axle, Trans & En…
×2
BOTTLENECK
C/T
1.2 h
C/O
90 min
Availability
83%
Quality FPY
95.8%
Batch / EPEI
14 / 3d
OEE
71.6%
i
Insert a step here
+
I
21
1.50 d
Drag to reorder step 4
BAY ASSEMBLY
4. Cab HVAC & Joyst…
×5
FIFO Lane
C/T
52.7 min
C/O
20 min
Availability
92%
Quality FPY
97.4%
Batch / EPEI
7 / 1d
OEE
85.6%
i
FIFO
Insert a step here
+
I
13
0.93 d
Drag to reorder step 5
RUN-OFF BAY
5. 3-Hour Dig Cycle…
×2
FIFO Lane
C/T
41.2 min
C/O
15 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
4 / 1d
OEE
88.5%
i
Insert a step at the end
+
I
21
1.50 d
Finished Goods
OUT
2.07 d
VA 43.7 min
2.43 d
VA 54.7 min
2.79 d
VA 1.2 h
1.50 d
VA 52.7 min
0.93 d
VA 41.2 min
1.50 d
Total Lead Time
11.5 d
VA Time
4.4 h
PCE
2.54%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step