Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
6MW Offshore Wind Planetary Multiplier
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.8 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.74 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
14.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
10.19%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Planetary Carrier Bore Align
3 < 4/day
Limit: downtime
Planetary Carrier Bore Align: capacity 3/day vs demand 4/day. Main limit: downtime. Raw C/T 4.0 h, effective C/T 5.0 h.
Quality (RTY)
89.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,330,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Forged ring-gear supp…
18CrNiMo7-6 Ring Gears
2x / week · LT 5d
PRODUCTION CONTROL / ERP
Manufacturing ERP
Batch Honing & Chrome Queue
CUSTOMER
Offshore Nacelle OEMs
4 units/d
Takt: 3.8 h
EDI / Daily Crate
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
6
1.50 d
Drag to reorder step 1
TURN PREP
1. 2.5m Ring Gear H…
×2
Push Flow
C/T
2.5 h
C/O
25 min
Availability
95%
Quality FPY
98.8%
Batch / EPEI
4 / 2d
OEE
91.3%
i
Insert a step here
+
I
7
1.75 d
Drag to reorder step 2
CNC CELL
2. Deep-Case Carbur…
×2
Push Flow
C/T
3.2 h
C/O
38 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
3 / 2d
OEE
83.8%
i
Insert a step here
+
I
9
2.25 d
QUALITY
In-Proces…
Drag to reorder step 3
SURFACE/HONE
3. Planetary Carrie…
×2
BOTTLENECK
C/T
4.0 h
C/O
45 min
Availability
84%
Quality FPY
95.0%
Batch / EPEI
4 / 2d
OEE
75.8%
i
Insert a step here
+
I
4
1.00 d
Drag to reorder step 4
CLEAN BAY
4. Oil Jet & Sensor…
×2
FIFO Lane
C/T
2.9 h
C/O
15 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
2 / 1d
OEE
89.2%
i
FIFO
Insert a step here
+
I
3
0.75 d
Drag to reorder step 5
HYDRO QC
5. Back-to-Back 6MW…
×2
FIFO Lane
C/T
2.3 h
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
94.1%
i
Insert a step at the end
+
I
6
1.50 d
Finished Goods
OUT
1.50 d
VA 2.5 h
1.75 d
VA 3.2 h
2.25 d
VA 4.0 h
1.00 d
VA 2.9 h
0.75 d
VA 2.3 h
1.50 d
Total Lead Time
9.74 d
VA Time
14.9 h
PCE
10.19%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step